Wednesday, October 5, 2011

Thursday, April 7, 2011

The Final Animation Due Week 13

Hi guys The final animation is due next week (WEEK 13 ),and no animation will be accepted after that. week 14 is for compositing only.Make sure your scenes are approved for animation by Barney and shown to Rafa for acting before the due date. You wont have time to fix them later on.You have everyone's e-mail, but if you want me to post it or send you the list please let me know.

Thursday, March 31, 2011

IMPORTANT!!!

Please keep in mind that we all need to FINISH ANIMATING TWO SCENES by NEXT WEEK APRIL 7, 2011, and the REST if your scenes NEED TO BE POSED OUT IN KEY FRAMES.

For the people who have ONE SCENES, I have given you more scenes now, so EVERYONE HAS AT LEAST TWO SCENES. Also, you can't alter the spreadsheet, and if you try to alter it, I have a master copy with me. Just sayin.

https://spreadsheets.google.com/ccc?key=0ApfgYbQZsRNPdFFMVm5YNmx0UThpbGpMQnJLNnFYclE&hl=en&authkey=CNiE1YgN#gid=0


-Bianca DG

Saturday, March 26, 2011

Flash animation due date and schedule

ALL animations are due week 12.the new assigned scenes will be ready by the scene set up group this Monday....week 13 is for reviews and making any needed adjustment and week 14 is for compositing...as you can see there is absolutely no time for delays.

please check your assigned scenes:
https://spreadsheets.google.com/ccc?key=0ApfgYbQZsRNPdFFMVm5YNmx0UThpbGpMQnJLNnFYclE&hl=en&authkey=CNiE1YgN#gid=0

(all the built characters are in the drop box that Bianca sent you .make sure you copy and paste them..don't take them directly from the drop box as it removes it completely !..you can also get them from Barney's outbox)

Saturday, March 19, 2011

Drop Box Issues

It has come to my attention that people just take things out of Drop Box. PLEASE DO NOT DO THIS. Copy and past please. We always need back ups, and that's what Drop Box is. Don't just take it, make sure that you have copied and pasted it.

Again, COPY AND PASTE. Thanks <3

-Bianca DG

Friday, March 18, 2011

FLASH FILES are READY

MORE NEWS!

Hey Everyone. If you want your life easier, you can grab the flash files which already have the leica and the audio in them ready at DROP BOX. Also, I will drop them off at Barney's OutBox Folder in the Mac Labs tomorrow, Saturday.

There are also Audio Files and FLV for the leica bits for you to take if you want/need them. Thanks to Alice and Parisa for all the hard work!

So take your scenes and start working!

-Bianca DG

Thursday, March 17, 2011

Assigned Animations and Scene Set Up

Here is the spreadsheet of everyone's assigned scenes.

https://spreadsheets.google.com/ccc?key=0ApfgYbQZsRNPdFFMVm5YNmx0UThpbGpMQnJLNnFYclE&hl=en&authkey=CNiE1YgN#gid=0

Also, as Barney has told me, if you want your scene set up done by the Scene Set Up people, please let us know ASAP. By that I meant NOW! Otherwise, if you want to do it yourself, you are free to do so as well.

Better, Faster, Longer Animatic

Friday, March 4, 2011

Mom, Cow, Kid Character Line Up

Here's the Final Cow, Mom and Kid Designs and the Character Line Up. Unfortunately there wasn't time to design a 3/4 back shot of the Mom, Gramps or the Kid so could the character builders please try and figure out the 3/4 back shot for those characters. They need back shots for the cartoon.z

Wednesday, February 23, 2011

Final BG schedule



Layout: Kitchen interior & House exterior
layout artists: Dongshin
Board artist: Kenji (begining of the story) & Bond (at the end of the story)

Layout: Oil tanker and chemical Dock
Layout artist: Brandon Chris/Hank
Board artist: Kenworth

Layout: The heart of the bayou and Factory
layout artist: Philip
Board artist: Roger

layout: Cockniferous forest
layout artist: Hank
Board artist: Roger

All clean and colored layouts in photoshop (with multiple layers if needed according to the boards) are due week 8.

Thursday, February 17, 2011

character building starts

Character builders can start building the characters :

character builders schedule:


Sam....Kid,worms,cow

Steph...Grandpa,maggots,airplane

Wei.....mom,waxed cat


Yolanda....deer,rabbit



ALL characters built (different view,hands,mouths and etc....)are DUE week 8.Make sure you build the characters according to the scene they're in.All the characters must be monitored and approved by Rafa and Lyna .Cathy is the character building supervisor and she can give you one of her own characters for you to reference.

Monday, February 14, 2011

More Layouts, Oiltanker & Factory

 Roughly Colored and Line art for some layout roughs.



FINAL SCRIPT

FINAL SCRIPT

Check it out! Barney and His Friend Dan did a final revision of the script fixing his fluidity.

Thursday, February 10, 2011

Maggot Designs

Scott here,
Character designs for the Maggots.

First we have your every day candy making working maggot.
Second is your very loveable gender confused maggot... just as hard working.

Style Reference

Here's Lyna's photo ref for the show. Use this first one a lot. REMEMBER WE ARE IN A SWAMP. The characters should be standing knee deep in mud.

Layout Designs

Hey storyboard artists here are some more layout drawings. Use this as inspiration for your storyboard designs.


Kitchen
DockForest.

Factory.

Rough Layout

 This is a colored rough i did a couple days ago. It is here even tho Rafa didn't like it! I don't entirely understand why I'm putting this here but....here you go
I still have a lot to work with these so if anyone has suggestions, i would more then gladly take them

Character Designs


Granpa and Kid Designs.

Grandpa expressions. This is how his mouth works.



Wednesday, February 9, 2011

Character Designs

If we don't put an out line on the characters then it will be easier for the builders to make them animation friendly and the animators won't have to worry about lines in the elbows and knees crossing over each other. Just an idea.